Media

TC Communication assists smart running and managing of Daxing International Airport

  • 2020-02-12
  • 16
font:

Afrer seven overall simulation drillings, 3 trial flights, Beijing Daxing International Airport enjoyed its highlight of “phoenix soaring”. The operation ceremony of Beijing Daxing International Airport was host on this 25th, September.

Beijing Daxing International Airport, located between Daxing District of Beijing and Guangyang District of Langfang, Hebei province, with line-distance of 46 kilometers to Tiananmen Square and 1,400,000 square meters of terminal building complex, is a new airport with the largest construction scale in the world. Now Daxing Airport has already owned more than 40 international and domestic no.1 records, 103 technical patents, 65 new construction methods and a localization rate over 98%.

Daxing Airport is been applied all-around configuration runways, “three longitude lines and one latitude line”, that is the all-around configuration of 3 parallel runways with a lateral one formally showed up. The all-around configuration design of “three longitude lines and one latitude line” broke through China’s former design of airport runways, fully considered its location and the relations with surrounding areas and operating environment. It managed to improve furthest the operating efficiency of this area by reasonable planning orientation layout of the runways. It also has new requirements on running and controlling of each airline.

The operating controlling center, as “brain” of airlines is the heart of safe flights working and running, production commanding and information distributing. It decides whether flights of each airline can take off, also the departure time and destination. Each airline paid importance to the construction of operating and controlling, especially on informatization aspect, so they can meet the requirements of airport’s smart operation and management.

Since the beginning of the project setting, Tiancheng Communication Company had paid attention to Daxing Airport’s construction. After many strict screening of samples, supervising, Tiancheng Communication, with years of experience in smart airport operation and management, stood out and successfully took part in information construction of the operation and controlling center of China Southern Airlines’ No.1 terminal and China Eastern Airlines, and the China National Aviation Fuel’s storage and transportation center.

During Daxing Airport’s smart operation and management construction, Tiancheng Communication Company applied Cat6 unshielded all-linked lines indoors and Cat6 unshielded cable outdoors. It met needs of audio systems among departments of each airline by laying out Cat3 Large logarithmic cable from PCR to every SCR. 10-Gigabit multi-mode cable was used in the main data line, which provides high-quality data transmission channels, so it can support the application of 10-Gigabit Ethernet.

Taking part in the construction of Daxing Airport is another typical airport construction case after it assisted the construction of Chengdu Tianfu Airport.

Share:
PrevNone
All
NextTC showed up at the 2019 Malaysia wire and cable exhibition
返回顶部